Gallery

  • Hooley | gallery1
    1. Lightweight but robust maintenance access cage
  • Hooley | gallery2
    2. Preventative crack-stitching in preparation for foundation injection
  • Hooley | Shield installation
    3. Insitu assembly of safety shield
  • Hooley | gallery4
    4. Rising damp and salt attack damage requiring remedial under-setting work
  • Hooley | gallery5
    5. Severely cracked masonry can often be repaired with crack-stitching
  • Hooley | gallery6
    6. Corrosion prevention is better than dangerous damage and costly repairs
  • Hooley | gallery7
    7. New verandah truss hold-downs
  • Hooley | gallery8
    8. Rafter hangers
  • Hooley | gallery9
    9. Sliding safety shield with hydraulic ram vertical
  • Hooley | gallery10
    10. Sliding safety shield with hydraulic ram inclined
  • Hooley | gallery11
    11. Waffle slab floor system preparation
  • Hooley | gallery12
    12. Truss tie-down strap attachment
  • Hooley | gallery13
    13. Temperature-humidity movement measurement
  • Hooley | gallery14
    14. Tie-down straps anchorage
  • Hooley | gallery15
    15. Prefabricated timber framing details
  • Hooley | gallery16
    16. Timber frame bracing panels
  • Hooley | gallery17
    17. Sandwich panel wall construction
  • Hooley | gallery18
    18. Roof tie-down strap attachment
  • Hooley | gallery19
    19. Detail view of sliding safety shield over opening around large hydraulic ram
  • Hooley | gallery20
    20. Ingenious sliding shields around tilting hydraulic rams
  • Hooley | gallery21
    21. Brickwork growth damage due to long term moisture expansion
  • Hooley | Roadway hatch at expansion joint
    22. Road bridge hatch spanning expansion joint
  • Hooley | gallery23
    23. URETEK foundation injection and wall alignment in progress
  • Hooley | gallery24
    24. Preparation for rigid anchorage of steel post at slab penetration
  • Hooley | Leslie Dam folding platform
    25. Folding access platform for maintenance of cone valves at a large dam in Queensland
  • Hooley | New floor beam
    26. Modified floor support
  • Hooley | Polystyrene block house
    27. Concrete core filled polystyrene block wall
  • Hooley | Masonry reinforcement
    28. Reinforced masonry
  • Hooley | Bulging Facia
    29. Facia bulge due to roof frames spreading
  • Hooley | Roofitie attachments
    30. Retro-ties to pull-back spreading roof and leaning wall
  • Hooley | Before safety shields
    31. Ram pit grid (before installation of sliding safety shield covers)
  • Hooley | Blade in shield
    32. Orbital collar blade locates safety shield
  • Hooley | Elevation of collar
    33. Collars 'float' in opening through sloping grid covers over ram pits
  • Hooley | Rams with collars
    34. Safety grids over ram-pits before installation of safety shields
  • Hooley | Ram collars from below
    35. Ram collar and sliding safety shield viewed from below ram-pit covers
  • Hooley | Roots in sewer lines
    36. Tree root infestation of sewer lines (viewed vertically down manhole)
  • Hooley | Historic cottage
    37. Historic cottage rejuvenated with URETEK foundation injection
  • Hooley | Poor painting, plywood weathermg
    38. Poor detailing and inadequate painting leading to premature rot of plywood cladding
  • Hooley | Uretek truck
    39. Truck mounted mobile URETEK plant
  • Hooley | Mud hut wrapped after bushfires
    40. Historic mud hut wrapped in plastic to prevent erosion following severe bushfire damage